Sunday 19 May, 2013
Home FAQ What happens when I power up a MASS-VIEW flow meter for the first time?

This video shows what happens when a MASS-VIEW® mass flow meter is powered on the first time. (video length 43 seconds)

After MASS-VIEW is powered up:
        • first the pre-installed fluid can be chosen
        • then the corresponding range
        • the digital output /communication bus
          (analogue output (0-5V) is always on)
        • and at last, the security settings can be changed

Your instrument is ready for operation.

Posted in: MASS-VIEW

   

PROTECTING YOUR SECURITY

McAfee Secure checks our sites daily to keep our sites safe from identity theft, credit card fraud, spyware, spam, viruses and online scams

 Your transaction is 100% safe and secure

PAYMENT METHODS


Click for more information about our payment methods

   
   
We assume the above mentioned distributor covers your country. If you are from another country than as
displayed on the flag then click on the distributors in the main menu to see who does cover your territory.

Mass Flow ONLINE on Facebook