Thursday 27 June, 2019
Home FAQ What happens when I power up a MASS-VIEW flow meter for the first time?

This video shows what happens when a MASS-VIEW® mass flow meter is powered on the first time. (video length 43 seconds)

After MASS-VIEW is powered up:
        • first the pre-installed fluid can be chosen
        • then the corresponding range
        • the digital output /communication bus
          (analogue output (0-5V) is always on)
        • and at last, the security settings can be changed

Your instrument is ready for operation.

Posted in: MASS-VIEW

   

PROTECTING YOUR SECURITY

McAfee SECURE sites help keep you safe from identity theft, credit card fraud, spyware, spam, viruses and online scams
Authenticated and Verified by Verisign
Your transaction is 100% safe and secure  

PAYMENT METHODS

Click for more information about our payment methods
   
   
We assume the above mentioned distributor covers your country. If you are from another country than as
displayed on the flag then click on the distributors in the main menu to see who does cover your territory.